01 / 13
Integra ProjectOS
Integra ProjectOS
Project & Job Costing Suite
🏗️ Closed-Loop Costing · India / GCC Ready

Cost sheets that
update themselves.

Estimate · Commit · Control · Bill

A cloud-native, multi-company project controls and job costing platform that runs the BOQ into the budget, commitments into the cost ledger, site progress into RA bills, and everything into earned-value dashboards — with Indian and Gulf commercial rules built in.

70+Screens
25+Modules
340+API endpoints
EN · ARBilingual · RTL
One project, one month — inside Integra ProjectOS
📐
BOQ approved → budget generated ₹ 8.50 Cr
Budget lines per cost code · baseline posted to the ledger
Baseline
↓
📜
Subcontract activated — ₹ 8.50 Cr committed
Retention 5 % · mobilisation advance 10 % · DLP 12 months
Committed
↓
📦
GRN posted — ₹ 38.6 L actual against PO
Accepted 1,180 of 1,200 bags · PO marked received
Actual
↓
🔄
Change order approved — +₹ 1.20 Cr
Budget revised · contract value increased · audit logged
Rippled
↓
🧾
RA Bill #2 certified — ₹ 2.14 Cr net
Cumulative qty from BOQ · retention, advance, GST, TDS, cess
Certified
↓
📈
EVM: CPI 0.96 · SPI 1.02 · EAC ₹ 10.1 Cr
Low-CPI smart alert raised to the PM — before month-end
Insight
⚠️ The Problem

Contractors Run the Job in Five Spreadsheets.

The estimate lives with the QS, the budget with the PM, the POs with purchase, the RA bill with accounts and the site diary on WhatsApp. None of them agree — and the margin disappears in the gaps.

📐
Estimate ≠ Budget
The winning BOQ is re-typed into a budget sheet. Rates drift, items are missed, and nobody can trace the baseline back to what was bid.
?
Commitments Are Invisible
Subcontracts and POs are signed but never posted. The cost report shows only invoices received — the real exposure is weeks behind.
Days
RA Bills by Hand
Cumulative quantities, retention, mobilisation advance recovery, GST, TDS and labour cess computed in Excel every month — and disputed every month.
Late
EVM After the Fact
CPI and SPI are produced for the quarterly review, from stale data, by one person who knows the formulas. Nobody acts on them.
📱
Site Reports on WhatsApp
Daily progress, RFIs, incidents and stock issues arrive as photos and voice notes. They never reach the cost sheet or the bill.
%
Variations Leak Margin
Site instructions become extra work before they become change orders. Budget, contract value and billing are updated — if at all — months later.
💡 The Solution

One Database. Estimate → Commitment → Actual → Bill.

1

Budget generated from the BOQ

One click turns the approved bill of quantities into budget lines per cost code. Approval posts the baseline to the ledger — no re-keying.

2

Commitments and actuals post themselves

Activating a contract or approving a PO posts commitments; posting a GRN posts actuals. The cost sheet is live, not month-end.

3

RA billing the Indian way, natively

Previous / current / cumulative quantities from the BOQ; retention, advance recovery, GST, TDS and labour cess on every certificate.

4

Change orders ripple automatically

Approving a variation revises the budget and raises the contract value — with an audit entry and a notification.

5

Field, governance and trading in the same system

DPR, RFI, QA, HSE, stores, tasks and risk feed the same cost codes. Multi-tenant, role-based, audited — plus a full trading job-transaction line.

Platform at a glance
1
Cost ledger — budget · commitment · actual · forecast
5
Events that post automatically — budget, contract, PO, GRN, change order
7
Statutory components on every RA bill
12
EVM metrics — BAC to TCPI — with S-curves
2
Business lines — construction & trading / logistics
🏛️ Complete Coverage

Eight Module Groups. One Cost-Code Spine.

Plus: tenders & bid pipeline · risk register & matrix · portfolio roll-up · audit trail · notifications · roles & permissions · organisation settings · super-admin tenant console · REST API

📐
Pre-Construction
Estimator · QS
  • Hierarchical BOQ with versions & approval
  • Cost codes, resources, rate analysis
  • Productivity norms library
  • Tender pipeline → convert to project
📜
Commercial
Contracts · Procurement
  • Contracts with retention, DLP, advance
  • POs with approval → commitment
  • GRN with accepted / rejected → actual
  • Vendor GST, payment terms
🏗️
Field Execution
Site Engineer
  • Daily Progress Reports with approval
  • RFIs, QA checklists, HSE incidents
  • Stores with stock guards
  • Schedule / Gantt, tasks Kanban
🔄
Change Control
Project Manager
  • Variations with cost & time impact
  • Identified → evaluating → approved
  • Auto-revises budget & contract value
  • RFIs with cost impact feed in
💰
Job Costing
Cost Engineer
  • Unified cost transaction ledger
  • Budget · committed · actual · forecast · variance
  • Source-linked lines, period tags
  • Cost-code summary & charts
🧾
Billing & Cash
Accounts
  • RA bills with cumulative quantities
  • Retention, GST, TDS, labour cess
  • Advances & recovery tied to bills
  • Monthly cash-flow planned vs actual
📈
EVM & Analytics
PM · CFO
  • PV, EV, AC, CPI, SPI, EAC, ETC, VAC, TCPI
  • S-curves, cost-code breakdown
  • Health score, forecast, smart alerts
  • Portfolio RAG, 12 CSV reports
🚢
Job Transactions
Trading · Marine · Logistics
  • Enquiry → quotation → job → invoice
  • LPO with two-tier approval
  • Item catalogue, serials, stock by location
  • 11 print-ready documents
⚙️ How It Works

From Tender to Certified Bill — in Four Moves

1
📐

Estimate

Win the tender, convert it to a project, build the BOQ by cost code, generate the budget and approve the baseline.

2
📜

Commit

Activate contracts and approve purchase orders. Commitments post to the ledger with retention and advance terms captured.

3
🏗️

Execute

DPRs record planned vs actual per cost code; GRNs post actuals; RFIs, QA, HSE and stores capture site reality; variations ripple.

4
🧾

Bill & Measure

Certify the RA bill with cumulative quantities and deductions. EVM, cash flow, health score and portfolio update from the same data.

📐 What You Capture
  • Tenders, BOQ items, cost codes
  • Resources, rates, norms
  • Contracts, POs, GRNs
  • DPRs, RFIs, inspections, incidents
  • Stock receipts & issues
  • Change requests, risks, tasks
🔗 What Gets Posted
  • Budget on BOQ approval
  • Commitment on contract activation
  • Commitment on PO approval
  • Actual on GRN receipt
  • Budget revision on change approval
  • Billed amount on RA certification
🛡️ What Gets Controlled
  • Approve / certify workflow actions
  • Status cannot be edited around
  • Two-tier LPO approval ladder
  • Negative-stock issues blocked
  • Role & tenant scoping on every call
  • Audit entry on every change
📊 What Comes Out
  • Live cost sheet by cost code
  • RA bill certificate with deductions
  • EVM S-curves, CPI / SPI / EAC
  • Cash-flow position by month
  • Health score & smart alerts
  • Portfolio RAG, CSV reports
🇮🇳 🇦🇪 Commercial Rules

RA Bills, Retention and Advances — Built In, Not Bolted On

Running-account billing, statutory deductions and advance recovery are product features with their own workflow — not a monthly spreadsheet exercise. Defaults are set once per organisation and editable per bill.

🧾

RA Bill (Running Account)

  • Lines per BOQ item: previous / current / cumulative
  • Rate pulled from the BOQ line
  • Gross and cumulative-to-date
  • Billing periods with number & dates
  • Draft → certified action
🔒

Retention & Advances

  • Retention % and limit per contract
  • Withheld and released amounts tracked
  • Mobilisation advance %, recovery rate
  • Recovery starts at a threshold %
  • “Calculate for bill” → “recover”
🏛️

GST · TDS · Labour Cess

  • Organisation default rates
  • Per-bill % and amount, editable
  • Other deductions, net recomputed server-side
  • GST & PAN on organisation letterhead
  • Vendor GST on contracts
🇦🇪

GCC & Trading

  • Per-document currency: AED, USD, INR …
  • Arabic interface with full RTL
  • LPO with two-tier approval
  • Freight & customs on quotations
  • Shipment modes, divisions, locations

📈 Earned Value (EIA-748 vocabulary)

BAC, PV, EV, AC · SV, CV · SPI, CPI · EAC, ETC, VAC, TCPI · % complete — monthly series as S-curves, breakdown per cost code, period endpoint for month-by-month reporting. CPI below target raises a smart alert.

💵 Cash Flow & Portfolio

Monthly planned vs actual inflow and outflow, net and cumulative position per project; portfolio roll-up of budget, committed, actual and billed with overall margin % and red / amber / green health per project.

Organisation defaultsCurrency & symbol, financial-year start, default GST / TDS / retention / cess rates, number prefixes.
Contract termsRetention %, limit, DLP months, mobilisation advance and recovery schedule captured once.
Every billDeductions applied automatically; totals recomputed on the server; certified via workflow.
RoadmapGST e-invoicing / IRN, e-way bill, TDS / TCS registers and labour-cess returns.
🧠 Analytics & Intelligence

Analytics That Watch the Job for You.

Every score, forecast and alert is computed live from the cost ledger, the schedule and the field modules — no overnight batch, no BI project, no one person who “knows the formulas”.

🩺
Project Health Score
Composite 0–100 with letter grade from CPI, schedule, RFIs, safety, stock and billing signals
Per project
📉
Cost Forecast
Trend-based forecast from monthly actuals, alongside EVM's EAC / ETC
Live
🚨
Smart Alerts
Organisation-wide, severity-sorted, surfaced on the dashboard and notifications
8 types

🔑 AI-Ready · Bring-Your-Own-Key

The AI provider console ships today: Google Gemini, Anthropic Claude or any OpenAI-compatible endpoint, with primary / fallback roles, timeouts and model settings — keys stored encrypted and never returned. The Integra Copilot layer (natural-language BOQ, variance explanations, document intelligence) is delivered on this foundation as a roadmap release.

💸
Budget OverrunActual or committed cost crossing the approved budget at project or cost-code level.
📉
Low CPICost performance index below threshold — flagged before the quarterly review.
⏱️
Schedule DelayActivities past planned finish or SPI slipping below target.
❓
Overdue RFIOpen RFIs past due date, with cost and schedule impact visible.
📜
Expiring ContractContracts approaching end date while work remains.
📦
Low StockStore materials under minimum level before the site runs dry.
🦺
Open Safety IncidentIncidents without closure or corrective action recorded.
⚠️
Stale RiskRisks not reviewed or updated within the review window.
3
Analytics tabs — Health · Forecast · Insights
12
CSV report exports
7
Screens with native charts
0
Overnight batches
⚡ Key Features

The Details That Protect the Margin.

📐

Budget from BOQ, One Click

Hierarchical BOQ items mapped to cost codes become budget lines with original, revised and approved-change amounts; the source BOQ is retained for traceability.

🔗

Auto-Posting Cost Ledger

Contract activation, PO approval, GRN receipt and change-order approval post budget, commitment and actual transactions with source links and period tags.

🧾

RA Bill Engine

Cumulative running-bill lines, retention and release, advance recovery, GST, TDS and labour cess, other deductions — net recomputed on the server, certified by workflow.

🔄

Change Orders That Ripple

Approved variations revise the budget and raise the project contract value automatically, with approved amount and days recorded separately from requested.

📈

Full EVM Set with S-Curves

BAC, PV, EV, AC, SV, CV, SPI, CPI, EAC, ETC, VAC and TCPI; monthly series charted; breakdown per cost code; colour-coded CPI / SPI badges on the dashboard.

🏗️

Field Suite on the Same Cost Codes

DPR activity rows with planned vs actual per cost code, RFIs with cost impact, QA auto-grading, HSE with root cause, stores with stock guards, Kanban tasks with burndown.

✅

Two-Tier Approvals & Status Discipline

LPO draft → pending 2nd approval → approved with cascading removal and status log; quotation approve / unapprove; generic edits can never flip a status.

🖨️

Print-Ready Documents

Eleven trading documents — quotation to invoice — with print preview, organisation letterhead, GST / PAN and per-document currency; CSV exports for every control module.

🔤

English & Arabic, RTL

Whole application in Arabic with right-to-left layout and per-user language preference; in-app animated workflow guides and help centre for every module section.

🏆 Competitive Edge

Integra ProjectOS vs the Usual Options

CapabilityIntegra ProjectOSProcorePrimavera / UnifierCMiC / ViewpointTally / Zoho + Excel
BOQ → budget → commitment → actual → bill in one database✓Partial✓✓✗
Indian RA bills with retention, advance recovery, GST, TDS, cess✓✗✗US-centricManual
Change orders auto-revise budget and contract value✓✓✓✓✗
EVM with CPI / SPI / EAC / TCPI and S-curves out of the box✓Limited✓Add-on✗
DPR, RFI, QA, HSE, stores in the same system as cost✓Field, light costSeparateSeparate✗
Trading / marine job transactions (enquiry → LPO → invoice)✓✗✗✗Partial
Two-tier purchase approval with cascading removal✓Basic✓✓✗
Arabic interface with full RTL✓✗Partial✗Partial
Multi-tenant with super-admin console and plan limits✓Vendor-onlyVendor-onlyVendor-only✗
Implementation in weeks, not quarters; cloud or on-premise✓Cloud onlyQuartersQuarters✓
Competitor capabilities based on publicly available product information, October 2026. “Vendor-only” = multi-company available only as the vendor's hosted SaaS; no customer-operated tenant console.
🏭 Use Cases

Built for Every Seat on the Project

Owner · Managing Director
💹

See Every Job's Margin, Today

Portfolio roll-up of budget, committed, actual and billed; red / amber / green health per project; smart alerts for overruns and low CPI — before the quarterly review, not after.

PortfolioHealth ScoreSmart Alerts
Project Manager
🏗️

Run the Job from One Screen

Project hub with BOQ, budget, contracts, procurement, field, change orders, cost control, billing and EVM as tabs; Kanban tasks and Gantt for the team; approvals and notifications in the header.

Project HubChange OrdersEVM
Quantity Surveyor · Estimator
📐

Bid Once, Baseline Once

Hierarchical BOQ by cost code with rates from resources and rate analysis; tender pipeline with win probability; the won bid becomes the project and the BOQ becomes the budget.

BOQRate AnalysisTenders
Accounts · Billing
🧾

Certify the RA Bill in Minutes

Cumulative quantities from the BOQ, retention and advance recovery from the contract, GST / TDS / cess from organisation defaults; net amount computed by the system; cash-flow actuals updated.

RA BillsAdvancesCash Flow
Site Engineer · Safety Officer
🦺

Report Once, It Reaches Everyone

DPR with labour, equipment and activity quantities per cost code; RFIs with cost impact; QA checklists that auto-grade; HSE incidents with root cause; stock issues that cannot go negative.

DPRQA / HSEStores
Trading · Marine Operations
🚢

Enquiry to Invoice, Approved

Quotation with freight and customs, job master linking every document, LPO with two-tier approval, delivery notes that move catalogue stock, proforma and final invoices printed on letterhead.

QuotationsLPOInvoices
🛡️ Security & Platform

Enterprise-Grade. Modern by Design.

🏢

Tenant Isolation

Every record scoped to its organisation; cross-tenant lookups rejected; a disabled tenant blocks all of its users instantly.

🔑

Hardened Authentication

Signed JWT sessions, bcrypt hashing, enforced password strength, email-based reset tokens, strong secret enforced at boot.

👥

Granular Permissions

None / view / edit / full across 23 modules; five role templates plus custom roles; immutable system roles; admin-only configuration.

🕐

Audit Trail

Before / after values, user, entity, IP and timestamp on every change and approval; organisation-wide screen plus per-record history.

🔗

REST API

340+ endpoints under /api/v1 with OpenAPI docs, typed schemas on every request and response, explicit CORS and clean error mapping.

💾

Operations

Versioned database migrations, timestamped backups with retention, supervised processes, SSL termination, health endpoint, documented restore.

🔒 Architecture

BackendPython FastAPI · async SQLAlchemy
FrontendNext.js · React · TypeScript
DatabasePostgreSQL 16
TransportHTTPS · signed JWT
UploadsSanitised · per-organisation paths
DeploymentCloud SaaS or on-premise
LanguagesEnglish · Arabic RTL
🇮🇳 🇦🇪
Data Residency
India, UAE or your servers
🏛️
Statutory-Ready
GST · TDS · cess · retention
🕐
Audit-Ready
Full trail, read-only viewer role
🌍
Multi-Currency
INR, AED, USD per org / document
🌟 Why Integra ProjectOS

The Closed Loop the Big Suites Charge Six Figures For — Without the Year-Long Rollout.

20+
Years building enterprise software
100+
Clients across GCC, India, Africa & SE Asia
70+
Screens · 25+ modules · 340+ API endpoints
1
Platform with Integra Finance, Ontrack ERP & WMS
🔁

Closed-Loop CostingBOQ to budget to commitment to actual to bill — one governed database, nothing re-keyed.

🇮🇳

India & GCC NativeRA bills, retention, advances, GST / TDS / cess; AED documents, Arabic RTL, LPO approvals.

🏗️

Site in the Same SystemDPR, RFI, QA, HSE, stores and tasks on the budget's cost codes — no field app to reconcile.

🚢

Two Business LinesConstruction controls and trading job transactions on shared tenants, masters and roles.

On the roadmap — released progressively to every customer
🤖

Integra CopilotNatural-language BOQ, variance explanations and document intelligence on the BYO-key AI console that ships today.

📐

AI Take-off & BIM 5DQuantities from PDF / DWG / IFC and drawing version compare, straight into the BOQ.

🔗

P6 / MSP & Accounting SyncTwo-way scheduling; Integra Finance, Tally, Zoho Books, SAP / Dynamics; webhooks.

📱

Mobile, E-Invoicing, Risk SimulationOffline field capture, GST IRN / e-way bill, Monte Carlo P50 / P80 confidence.

Integra ProjectOS
Estimate · Commit · Control · Bill

See It Run on
Your Own BOQ and Last Month's RA Bill.

Bring your bill of quantities, one live subcontract and your latest running-account bill. We'll show you the budget generated from the BOQ, the commitment posted from the contract, the certified bill with every deduction, and the EVM curve — on your data, live.

Email
sales@integraontrack.com
Phone / WhatsApp
+971 55 222 0975
Platform
project.integraerp.tech
Head Office
Sharjah Publishing City Free Zone, UAE
Integra IT Solutions FZE LLC · formerly Edocs Solutions & Computer Consultants · P.O. Box 73111, Sharjah, United Arab Emirates